Doprava zadarmo s Packetou nad 59.99 €
Pošta 4.49 SPS 4.99 Kuriér GLS 3.99 Zberné miesto GLS 2.99 Packeta kurýr 4.99 Packeta 2.99 SPS Parcel Shop 2.99

Analysis of the Acquisition Process for Simplified Acquisition of Base Engineering Requirements Contracts and Its Potential Impact on Contractor Perfo

Jazyk AngličtinaAngličtina
Kniha Brožovaná
Kniha Analysis of the Acquisition Process for Simplified Acquisition of Base Engineering Requirements Contracts and Its Potential Impact on Contractor Perfo Brian J Heaps
Libristo kód: 08250554
Nakladateľstvo Biblioscholar, december 2012
The Simplified Acquisition of Base Engineering Requirements (SABER) contract's main purpose is to ex... Celý popis
? points 150 b
59.92
Skladom u dodávateľa Odosielame za 15-20 dní

30 dní na vrátenie tovaru


Mohlo by vás tiež zaujímať


The Simplified Acquisition of Base Engineering Requirements (SABER) contract's main purpose is to expedite contract award of civil engineer requirements through the issuance of individual delivery orders. The contract contains a collection of detailed task specifications that include most types of real property maintenance, repair, and construction work. The Assistant Secretary of the Air Force for Acquisition's Operational Contracting Division (SAF/AQCO) identified a number of failed SABER contracts. The problem statement designed for this research effort was: There are a large number of SABER contractors that are failing during the performance period on their SABER contracts. SAF/AQCO is trying to identify whether any Government actions or procedures are negatively impacting the contractor's ability to perform satisfactorily on the SABER contract. This research effort focused on five areas within the SABER process that is controlled by the Government. A qualitative approach using case study analysis was used. Seven SABER contracts were selected as case studies. The research did not identify any Air Force-wide procedures in the five areas that negatively impacted the contractor's ability to perform satisfactorily on the contract. The research identified two areas of potential follow-on research.

Informácie o knihe

Celý názov Analysis of the Acquisition Process for Simplified Acquisition of Base Engineering Requirements Contracts and Its Potential Impact on Contractor Perfo
Jazyk Angličtina
Väzba Kniha - Brožovaná
Dátum vydania 2012
Počet strán 104
EAN 9781288409150
ISBN 9781288409150
Libristo kód 08250554
Nakladateľstvo Biblioscholar
Váha 200
Rozmery 189 x 246 x 6
Darujte túto knihu ešte dnes
Je to jednoduché
1 Pridajte knihu do košíka a vyberte možnosť doručiť ako darček 2 Obratom Vám zašleme poukaz 3 Knihu zašleme na adresu obdarovaného

Prihlásenie

Prihláste sa k svojmu účtu. Ešte nemáte Libristo účet? Vytvorte si ho teraz!

 
povinné
povinné

Nemáte účet? Získajte výhody Libristo účtu!

Vďaka Libristo účtu budete mať všetko pod kontrolou.

Vytvoriť Libristo účet